May 14, 2025
Along with a lot of landscaping, many exterior features are nearing completion. The Washington Department of Commerce awarded NOLS a Solar plus Storage grant to integrate a large solar array and battery backup system into the building. If the power goes out, the batteries will allow the Library to continue operating—managing the building’s climate, providing light, and allowing people to charge their devices.
Cedar siding is being installed on all sides of the building and we’ve been impressed with how nice it looks! There are large sections on the south and east sides of the building that are temporarily covered in plywood. Those walls at the front entrance, children’s area, and back east wall will all get floor-to-ceiling windows in the near future.